For questions about municipal activities such as zoning, land-use, permits, incentives
Jay Hallett, Development Officer, Municipal District of Willow Creek 403-625-3351 | [email protected] https://invest.mdwillowcreek.com
As is, where is opportunity in the Claresholm Industrial Airport Park for warehouse, storage, or industrial user. This 44,660 SF space is clear-span to the middle of the building, with 18’ ceilings, and four 16’ high overhead doors to access the warehouse area. Building improvements include updated metal siding, an upgraded fire suppression sprinkler system throughout the warehouse area, twelve new ceiling-mounted radiant tube heaters to supplement forced air, a 40-gallon hot water tank, and developed office space. There are office, storage, and staff areas in both the north and south of the building, with a washroom and mezzanine space located in the center of the warehouse. The large, fully fenced and gated, 4.76-acre yard is ideal for equipment or product storage and can be accessed from both the north (via Harvard Drive) and south of the site (via TWP Road 123). Located in the Claresholm Industrial Airport Park, this site offers convenient access to the property via Highway AB-520. Being located between Lethbridge and Calgary offers the owner-user access to two prime markets while taking advantage of the low per-square-foot (PSF) rates in this rural industrial park.
Note: distances are in straight line, rather than driving distances
- Highway 520 - Less than 1 km (High Load Corridor)
- Highway 2 - 4.9 km (High Load Corridor)
- Highway 527 - 17.6 km
- Highway 529 - 24.03 km
- Highway 811 - 22.1 km
- Claresholm General Hospital - 4.28 km
- International: Calgary International Airport - 127.69km
- Regional: Lethbridge Airport - 73.71km
- AltaLink - 1037L 240kv, Double Circuit w/ 1038L - 4.24 km
- STAVELY - 349S , AltaLink - 17.72 km
- Within 23.25 km
- Canadian Pacific, Class : Main - 36.02 km
-
Within 71.86 m
Service Area: ATCO Gas – ATCO Natural Gas Distribution Customer Correspondence
-
Stavely (STV1), Concord Stavely Partnership - 18.19 km
Solar, 17 MW
- Ready/Available
- Availability is estimated. Contact an internet service provider for more information.
Type | Name | Operated By | Types of Products Shipped | Distance |
---|---|---|---|---|
Grain | CP Vulcan | Richardson Pioneer |
|
50.67 KM |
Transload | CP Monarch | More Than Just Feeds |
|
44.15 KM |
Gain | CP Blackie | Cargill |
|
66.67 KM |
Yard | CP Kipp Yard Coalhurst | Canadian Pacific |
|
55.82 KM |
Grain | CP Carseland | Cargill |
|
94.35 KM |
Site Data Provided by: | Pillar9 ™ |
The information provided on property listing pages is sourced from third-party data providers. While we make every effort to ensure the accuracy of the information presented, we cannot guarantee its completeness or correctness. Users are advised to conduct their own due diligence and verify all details independently. The Government of Alberta, its agencies, and affiliates shall not be held liable for any inaccuracies or omissions in the property listings or for any actions taken in reliance on the information provided herein. Use of the information provided on property listing pages is at all times subject to the terms of the Disclaimer and Terms of Use. |