New mix-use development from Centron located in East Chestermere. Trans Canada HWY is a major arterial from east/west.
Clearwater Park by Alberta development leaders Centron, is a master planned, mixed-use development located in the East Chestermere area of Rocky View County, just minutes from Calgary off the TransCanada Highway
7 retail buildings between 1,000 to 5,000 sf with various demising options.
Clear water will be home to 10,650 residents (up to 1,500 single family rentals)
Clear water Park encompasses over 580 acres of development opportunity
Clear water Park will provide a diverse and inclusive mix of residences including single family & multi-family houses, purpose built residential leasing, seniors residential campus, neighborhood retail, and light commercial & industrial
Recreation amenities include water features, skating rink, a community clubhouse, school sites with playfields, and numerous walking paths
Anchored by Gas Bar convenience store with a car wash
Building 3: 2,526 sf w/ 581 sf patio
Building 4: 3,547 sf
Building 6: 3,985 sf w/ 642 sf patio
Building 7: 2,548 w/758 sf patio
Welcome to Chestermere's newest master planned, mixed-use development located in the east Chestermere area of Rocky View County. Chestermere can be access from multiple points along the eastern and western arterial roads. Primary north and south arterials include Stoney Trail, HWY 791, HWY 797, east and west arterials include Trans Canada HWY 1. By Alberta's development leaders Centron, this 580 acres of development will be home to over 3,350 homes and 10,650 residents, with up to 1,500 single family rentals which will accelerate population density/consumer base. Look forward to developments that include a diverse and inclusive mix of residences, single-family and multi- family houses, purpose-built residential leasing, a senior's residential campus, plus a neighborhood retail, light commercial and industrial. As part of it's phased development, Clearwater retail plans on developing in 2024/25, with approx. 20,000 square feet of services including, confectionaries, specialty medical, food, and more, all on a beautiful retail promenade.
Note: distances are in straight line, rather than driving distances
- Highway 1 - 1.31 km (High Load Corridor)
- Highway 1A - 2.58 km
- Highway 560 - 7.8 km (High Load Corridor)
- Highway 564 - 11.62 km (High Load Corridor)
- Highway 9 - 8.21 km (High Load Corridor)
- Peter Lougheed Centre - 13.55 km
- International: Calgary International Airport - 17.36km
- AltaLink - 925L 240kv, Double Circuit w/ 901L - 2.34 km
- CHESTERMERE - 419S , AltaLink - 4.63 km
- SHEPARD - SS-25 , ENMAX - 10.86 km
- Within 3.82 km
- Canadian National, Class : Main - 4.04 km
- ATCO Gas - City Of Chestermere
-
Shepard (CT1) (EGC1), Enmax Shepard Services Inc. - 10.74 km
Combined Cycle, 868 (240) MW
- Ready/Available
- Availability is estimated. Contact an internet service provider for more information.
Type | Name | Operated By | Types of Products Shipped | Distance |
---|---|---|---|---|
Yard | CN Calgary Logistics Park | Canadian National |
|
6.81 KM |
Transload | CN Calgary | KLEYSON GROUP LTD |
|
8.86 KM |
Transload | CN Calgary | TRANSX |
|
10.64 KM |
Grain | CN Lyalta Grain Terminal | Parrish & Heimbecker Ltd. |
|
10.19 KM |
Grain | CP Indus | Viterra |
|
17.77 KM |
Site Data Provided by: |
|
The information provided on property listing pages is sourced from third-party data providers. While we make every effort to ensure the accuracy of the information presented, we cannot guarantee its completeness or correctness. Users are advised to conduct their own due diligence and verify all details independently. The Government of Alberta, its agencies, and affiliates shall not be held liable for any inaccuracies or omissions in the property listings or for any actions taken in reliance on the information provided herein. Use of the information provided on property listing pages is at all times subject to the terms of the Disclaimer and Terms of Use. |